Kitchens and baths
A remodel of this kind is renovation. The survey comes prior to any demolition or renovation activity, and the amount of material removed sets the district’s notification fee.
Typical cost in Santa Monica
Building work under Rule 1403 is either renovation or demolition. Taking out a load-supporting structural member, a bearing wall for example, counts as demolition, and demolition needs the district notice whether or not asbestos turns up.
Santa Monica collects extra papers when a demolition permit is issued, so we plan the abatement and the district notice around that date.

A remodel of this kind is renovation. The survey comes prior to any demolition or renovation activity, and the amount of material removed sets the district’s notification fee.
Cutting in a new opening or taking out a bearing wall turns a remodel into demolition. The small-renovation exceptions stop there, and the notice rules apply.
A teardown needs both the survey and the district notice finished first. Aim for the notice to be in no later than 10 working days before crews arrive.
Apartment, condo and townhouse projects are never single-unit jobs, so the survey exception and owner-occupant provision written for single-unit homes are off the table. Our apartment and condo page covers them.
The city lists an asbestos report with a signed certification form and the Rule 1403 form among the documents collected when a demolition permit is issued. The district explains that state law requires a copy of the notification to go to the local building department with the permit application.
Fire changes none of this. A building destroyed by fire, explosion or natural disaster remains subject to the rule with its debris, and the district’s first step is a survey by a Certified Asbestos Consultant.
Before hiring for abatement of 100 square feet or more of surface area of asbestos containing materials, check the license. A C-22 Asbestos Abatement classification or a qualifier with the asbestos certification examination is required, and the Contractors State License Board issues a C-22 license only to contractors registered with Cal/OSHA.

See apartment and condo abatement for larger buildings, and the home page for other services.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (424) 487-4319