Asbestos Removal in Beverly Hills

The first job on any Beverly Hills property, whether a house or an apartment building, is the survey. EPA Building Inspector training sits behind the Cal/OSHA-certified asbestos consultant or technician who collects the samples.

Beverly Hills counts nearly 4 homes in 10 from before 1950 and nearly 8 in 10 from before 1980. The midpoint is 1958, since half of Beverly Hills’ homes were built in or before 1958.

Request a free quote
Bathroom opened for a remodel, with plastic sheeting at the left, a bathtub framed by exposed wall studs, white mosaic floor tile lifted in places and pink and green tile on the right wall

How we can help

Testing first

Our asbestos testing gets the samples to a lab and puts the results in a written survey you can hand to the building department.

Ceilings

Texture that tests positive is removed through popcorn ceiling removal. Testing always happens before anyone touches the ceiling.

Floors

Under floor tile and mastic removal, every layer of the floor is sampled, adhesive included, and a positive result means the tile and mastic come out as one asbestos job.

Beverly Hills housing

Apartments weigh heavily in Beverly Hills housing, with 52.0% of homes in buildings of five or more units against 39.1% in one-unit homes. In all, 59.0% of Beverly Hills homes are rented, and 53.2% of all homes predate 1960.

Homes from before 1980

That age group covers 79.0% of the homes. The survey rule has no build-year cutoff, so a newer Beverly Hills building is surveyed as well.

Apartments and condos

Our apartment and condo abatement service plans surveys and paperwork for buildings with several units, which hold 52.0% of the homes here.

Beverly Hills demolition permits

The city’s demolition permit guidelines say every building needs a pre-demolition or pre-remodeling investigation by a Cal/OSHA Certified Asbestos Consultant. The consultant shall submit a survey stating that asbestos is or is not present in the building prior to obtaining the demolition permit.

The notification copy

If the survey finds asbestos, the guidelines call for a copy of the South Coast Air Quality Management notification of demolition and asbestos removal form to be submitted to the building department before the permit is issued.

The checklist

The city’s demolition checklist also lists an asbestos abatement permit, marked as required for all buildings. Ask the Beverly Hills building department how it applies to your project.

Room with plastic sheeting over the floor and bags of debris, where plaster has fallen from a wall corner to show the wood lath beneath, beside white double-hung windows

Frequently asked questions

Do condos and apartments get the small-job survey exception?

Not the survey exception, no. Rule 1403 leaves condos and apartments out of its residential single unit dwelling definition, which is the group that exception was written for. The separate notice exemption below 100 square feet is not tied to housing type.

How far ahead does the district notice go in?

It has to be submitted no later than 10 working days before demolition or renovation activities, and it comes with a notification fee. We file it online for the jobs we do.

Who tests the air after removal?

Someone independent of the removal crew does. Contractors are barred from clearance air monitoring under California law, so a consultant takes the post-removal samples instead of us.

Where can I confirm the rules for my address?

The Beverly Hills building department can tell you how its process applies to your address. The district’s asbestos hotline, (909) 396-2336, can confirm South Coast AQMD’s rules.

Keep reading with asbestos removal in Malibu, which has its own page for fire debris and local questions, or head back to the home page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (424) 487-4319

Call (424) 487-4319