Apartment and Condo Abatement in Santa Monica

Typical cost in Santa Monica

  • Survey of a commercial suite or small building$2,000 – $5,000+
  • One apartment or condo unit, ceilings and floors$4,500 – $11,000+
  • One office or shop suite, about 1,000–1,500 sq ft$7,500 – $20,000+

A Santa Monica building with several units never counts as a single-unit dwelling when Rule 1403 is applied, and the rule names apartment buildings, townhouses and condominiums outright. The narrow survey exception and owner-occupant provision written for one-unit houses therefore leave every unit in the building out.

That holds for a condo owner redoing one kitchen as much as for a landlord renovating a floor of units. Each job starts with a survey.

Request a free quote
Two-story apartment building around a courtyard, with exterior stairs and walkways, orange doors, a bed of agave plants and trimmed hedges

Building work we plan

Unit turnovers

A unit emptied between tenants is sampled in the rooms the work will touch. The survey record can sit in the building file beside the unit’s paperwork.

Condo remodels

A condo owner’s kitchen or bath remodel is renovation in a building that is not a single-unit dwelling, so the survey comes first, and the notice rules apply unless the removal is under 100 square feet.

Shared hallways and stairwells

Common areas are part of the building and part of the survey. They are planned as their own work areas, separate from any individual unit.

Whole-building projects

Re-piping, reroofing or a full floor renovation across many units calls for one survey plan and one schedule for the notice, the crew and the final air tests.

Paperwork for property managers

Santa Monica’s homes are in larger buildings, with 66.0% in buildings of five or more units, and renters live in 72.1% of them. A building file therefore matters as much as the job itself.

Crew registration

No crew may start a job involving 100 square feet or more of surface area of asbestos-containing material until its employer holds a Cal/OSHA registration. The registration lasts one year, and a manager can ask to see it before the first day on site.

Contractor license

The license number you record for an abatement company should come from the Contractors State License Board and show the C-22 Asbestos Abatement classification or the ASB certification. Keep it beside the building’s survey records.

The district notice

We file the notice online, and the district’s notification fee goes in with it. For any demolition or renovation activities, the filing has to be made no later than 10 working days ahead of the start.

Empty apartment living room with a textured ceiling, a large window, a doorway on each side and a worn parquet floor

Start with asbestos testing for each unit, then see the home page for more.