Unit turnovers
A unit emptied between tenants is sampled in the rooms the work will touch. The survey record can sit in the building file beside the unit’s paperwork.
Typical cost in Santa Monica
A Santa Monica building with several units never counts as a single-unit dwelling when Rule 1403 is applied, and the rule names apartment buildings, townhouses and condominiums outright. The narrow survey exception and owner-occupant provision written for one-unit houses therefore leave every unit in the building out.
That holds for a condo owner redoing one kitchen as much as for a landlord renovating a floor of units. Each job starts with a survey.

A unit emptied between tenants is sampled in the rooms the work will touch. The survey record can sit in the building file beside the unit’s paperwork.
A condo owner’s kitchen or bath remodel is renovation in a building that is not a single-unit dwelling, so the survey comes first, and the notice rules apply unless the removal is under 100 square feet.
Common areas are part of the building and part of the survey. They are planned as their own work areas, separate from any individual unit.
Re-piping, reroofing or a full floor renovation across many units calls for one survey plan and one schedule for the notice, the crew and the final air tests.
Santa Monica’s homes are in larger buildings, with 66.0% in buildings of five or more units, and renters live in 72.1% of them. A building file therefore matters as much as the job itself.
No crew may start a job involving 100 square feet or more of surface area of asbestos-containing material until its employer holds a Cal/OSHA registration. The registration lasts one year, and a manager can ask to see it before the first day on site.
The license number you record for an abatement company should come from the Contractors State License Board and show the C-22 Asbestos Abatement classification or the ASB certification. Keep it beside the building’s survey records.
We file the notice online, and the district’s notification fee goes in with it. For any demolition or renovation activities, the filing has to be made no later than 10 working days ahead of the start.

Start with asbestos testing for each unit, then see the home page for more.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (424) 487-4319