Popcorn Ceiling Removal in Santa Monica

Typical cost in Santa Monica

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+

Only a lab can say whether a textured ceiling contains asbestos, so we begin with samples. Nobody should scrape, sand or wet the texture until the result is back. Please do not take samples yourself.

When the texture tests positive, the removal runs as an asbestos job and the district notice goes in first. When it tests negative, you hold a written result to give whoever finishes the ceiling.

Request a free quote
Empty living room with a textured popcorn ceiling, beige carpet, a sliding glass door and window looking onto trees, and a doorway to a hall

Ceiling jobs we handle

One room or every ceiling

A single bedroom and a full apartment both start with samples from each textured surface. The amount removed sets the district’s notification fee, and a job involving 100 square feet or more of surface area brings Cal/OSHA registration for the crew.

Painted or stained texture

Paint over the texture and old water marks do not change how we start. A painted or stained ceiling is sampled like any other, and the lab report lists the result for each sample.

Work above the ceiling

Rule 1403’s survey reaches all material in wall or ceiling cavities as necessary. When lights, ducts or wiring are going in above the ceiling, that material is part of the sampling plan.

Leaving it in place

A ceiling that stays as it is needs no removal. Cutting into it for a new light, a fan or a wall is renovation, though, and the survey comes before that work.

Around a ceiling job

A ceiling job brings district paperwork, a requirement for the crew and a final air test, and each has its own rule.

The district notice

We file the district notice online, and the filing comes with a notification fee. The deadline is no later than 10 working days before the ceiling work starts.

Who may do the work

Contractor licensing is the third piece. The Contractors State License Board lists each license number, and for 100 square feet or more of surface area of asbestos containing materials it should show the C-22 Asbestos Abatement classification, or a qualifier who passed an asbestos certification examination.

After the removal

An independent consultant tests the air once the ceiling work is finished. We do not run that test ourselves, because California law keeps contractors out of clearance air monitoring.

Upstairs hall with a textured ceiling, plastic sheeting along the lower walls and floor, a wood stair railing and a portable air machine with a flexible duct at the far end

Ceiling samples start with asbestos testing; the home page covers the other services.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (424) 487-4319

Call (424) 487-4319