Drywall, Joint Compound and Plaster Removal in Santa Monica

Typical cost in Santa Monica

  • One wall or a new doorway, up to about 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+

Older walls can stack drywall over plaster over lath, and each layer is its own sample. Inside the wall or ceiling cavities the survey takes in all material as necessary to identify and sample it, so the sampler works through the full stack.

Material that tests positive comes out under asbestos work practices. Anything that tests negative needs no asbestos work, and the written results show which is which.

Request a free quote
Room with plastic sheeting over the floor and bags of debris, where plaster has fallen from a wall corner to show the wood lath beneath, beside white double-hung windows

Wall and ceiling materials

Drywall and joint compound

The sheet and the compound on its seams are different materials, and each is sampled on its own. A negative result on one says nothing about the other.

Plaster walls and ceilings

Plaster is sampled through its layers, and the lab report lists every layer it tested as a separate line, so you can see which layers came back positive.

Opening a wall

Before a wall is opened for a door, a pipe or a new outlet, the material inside the cavity is part of the survey, so the samples are taken before the opening is made.

Patches and repairs

A repaired corner or a skim-coated section may not match the wall beside it. We take a separate sample from it and give it its own line in the report.

Before the walls open

Walls are where a remodel and a demolition meet, so the paperwork depends on what you are taking out.

Load-bearing walls

Taking out any load-supporting wall or other structural member is demolition under Rule 1403. The renovation exceptions do not apply, and the district notice is required.

The survey record

The survey report is a record of the samples taken, where they came from and what came back. If your plan later adds a wall or a room, the new area needs its own samples, since the old report never covered it.

Crew paperwork

Cal/OSHA wants a registration in the employer’s hands before work starts on 100 square feet or more of surface area of asbestos-containing material, and each registration lasts one year.

Room with plastic sheeting on the floor and walls and a section of wall between two windows opened to the framing, with plaster rubble and a bag of debris below

Sampling is explained under asbestos testing, and the home page has every other service.